May 16th
Updated: May 18, 2022
Our first work day is under our belt. Today we met with some INF personnel to establish our plan to start the building process. Through this communication we were able to aquire a work space and take inventory of the tools we are provided with. Jared and Ethan worked in the shop cleaning, assembling the three roller, and practicing stick welds while the rest of our team went to a steel yard to pick up the square tubing and angle iron we need for the frame. Tomorrow we are hoping to cut and start welding the frame of the chair along with acquiring some more materials from local shops. Overall, today was a very productive day and as of right now we are ahead of schedule. We thank God for the wonderful hospitality the Nepali people have and the great communication we have with the INF employees here at Green Pastures Hospital. I have attached a picture of the shop we will be building the wheelchair in along with a picture of the steel yard we visited today. Unfortunately, the weather was not in our favor and a big storm hit for most of the day which resulted in a short term power outage. It is the start of the monsoon season here, so the rain is to be expected. Luckily, we were able to time our trip to the steel yard so that we remained somewhat dry, but Jared and Ethan got held up in a local shop waiting for the rain and the winds to die down. Please pray that the weather is to our advantage and that we are able to stay on track with our schedule as the days go by. Team tea consumption: 67 cups Team Coke consumption: 45 bottles





Comments